Categories | Steel Frame Multi Storey Buildings |
---|---|
Brand Name: | CT Steel Structure |
Model Number: | Multistorey86101 |
Certification: | SGS |
Place of Origin: | China |
MOQ: | 500 square meters |
Price: | $40-160 per square meter |
Payment Terms: | L/C,T/T |
Supply Ability: | 200, 000 Tons / Year |
Delivery Time: | 3-5weeks |
Packaging Details: | Single package size: 1200 × 200 × 200 cm |
Name: | Steel Frame Multi Storey Buildings |
Apply: | Easy to Apply |
Toughness: | Good Toughness |
Industrialization: | High Degree of Industrialization |
Period: | The Constrution Period Is Short |
Strength: | High |
Number Of Storeys: | Multi Storey |
Structure Type: | Frame |
Material: | Steel |
Maintenance: | Low |
High-Strength Seismic Customized H-Shaped Steel Structure Multi-Storey Building Structure
High-strength seismic customized H-shaped steel structure multi-storey building structure
Steel structure multi-storey buildings are widely used, in the commercial field, often built as shopping malls and office buildings, its large-span space can be flexibly divided to meet a variety of commercial layout and office needs; In terms of housing, prefabricated steel structure multi-storey houses provide residents with safe and comfortable accommodation by virtue of their fast construction and good seismic resistance; In the educational place, the school teaching building adopts a steel structure, which can flexibly plan classrooms, laboratories and other spaces to meet the requirements of modern teaching; In addition, it is also suitable for hotels, apartments, industrial plants, etc., and can shape an adapted space structure according to different usage scenarios and functional requirements.
Name | Steel structure multi-storey building | |
Dimensions | Length | H beam: 4000-15000mm |
Thickness: | web plate: 6-32mm | |
wing plate: 6-40mm | ||
Height | 200-1200mm | |
Color | According to customers | |
Size | MOQ is 200 m2, width * length * eave height, | |
Advantages | 1. Lower cost but beautiful outlook. | |
2. High safety performance. | ||
3. easy to assemble and dismantle | ||
4. manufacture under complete quality control system---ISO9001 | ||
5. installation with instruction of experienced engineers | ||
6. Non-pollution. | ||
Main components | Base | Cement and steel foundation bolts |
Main frame | H beam | |
Material | Q235B, Q345B or others as buyers' requests. | |
Purlin | C or Z purlin: Size from C120~C320, Z100~Z20 | |
Bracing | X-type or other type bracing made from angle, round pipe | |
Bolt | Plain bolt and High-strenth bolt | |
Roof & wall | Sandwich panel or color plate | |
Door | Sliding or rolling door | |
Window | Aluminium alloy window | |
Surface | Two lays of Anti-rust Painting or Hot Dip Galvanized | |
Sheet | 0.5mm or 0.6mm galvanized sheet | |
Accessories | Semi-transparent skylight belts, Ventilators,down pipe, Glavanized gutter, etc |
Product Advantages:
Advantages for industrial use
In industrial scenarios, steel multi-storey buildings show
excellent adaptability. For multi-storey industrial plants, the
high load-bearing capacity of the steel structure can meet the
installation needs of large-scale production equipment, and the
floor layout can be carefully planned according to the process flow
to achieve the efficient flow of raw materials, semi-finished
products and finished products. For example, electronic
manufacturing enterprises can set up a dust-free workshop on the
upper floor to ensure a clean production environment, and the
bottom layer can be used for cargo loading and unloading and
warehousing to optimize logistics routes. The rapid construction
characteristics of the steel structure greatly shorten the
construction period of the plant, so that the enterprise can be put
into production faster and seize market opportunities. At the same
time, its flexible space transformation is convenient for
enterprises to adjust the internal space at any time according to
product upgrades and capacity expansion, and it is relatively
convenient to dismantle or add part of the structure, which reduces
the cost of enterprise transformation and upgrading. In addition,
in the chemical, metallurgical and other industries with special
requirements for construction, steel with strong corrosion
resistance can be selected to ensure the long-term stable operation
of the building in the harsh industrial environment, reduce the
frequency and cost of maintenance, and strongly support the
sustainability and stability of industrial production.
Advantages for commercial use
In the commercial field, the advantages of steel structure
multi-storey buildings are fully revealed. Its large-span spatial
characteristics make shopping malls, shopping malls and other
commercial complexes can be freely planned, without too many
load-bearing columns, and can create an open atrium and spacious
business area to meet the layout needs of various large-scale shops
and entertainment facilities, and enhance the attractiveness and
utilization rate of commercial space. The steel structure of the
office building makes it easy to flexibly divide the office space,
whether it is a large open office area or an independent private
office, it can be easily realized, and can be adjusted at any time
according to the scale and business needs of the enterprise,
providing great convenience for modern commercial office. At the
same time, the construction period of steel structure buildings is
short, which can make commercial projects open and operate faster,
seize market opportunities, and achieve profitability as soon as
possible.
Educational Benefits
For educational buildings such as schools, steel structure
multi-storey buildings are flexible and economical. The functional
partitions of schools are diverse, and the space requirements for
classrooms, laboratories, libraries, gymnasiums, etc. are
different, and the steel structure building can easily cope with
this diverse demand. The flexible space arrangement can be adapted
to changes in teaching patterns, such as merging multiple small
classrooms into a large multimedia teaching hall or dividing group
discussion rooms. In terms of construction cost, the construction
speed of steel structure building is fast, which can reduce labor
costs and management costs in the construction cycle, and the later
maintenance is relatively simple, which reduces long-term operating
costs, so that limited education funds can be used more
efficiently, and provides a solid hardware foundation for
education.
Why choose us:
At the design level, the company brings together senior designers in the industry, using cutting-edge modeling software and rich experience to deeply understand customer needs and customize exclusive design solutions. From the beginning of the project, the structural layout was accurately planned according to the building use and site conditions, taking into account the aesthetics and function, and the component size and connection method were repeatedly scrutinized and optimized to ensure that the design not only met the mechanical properties, but also improved the space utilization rate, and endowed the building with flexible characteristics.
In terms of steel selection, the company works closely with
large-scale high-quality steel mills to build a strict material
selection system. The steel used is sourced from reliable sources
and has undergone multiple quality tests to ensure that the
strength, toughness and corrosion resistance reach high standards
to ensure the stability and durability of the building. Not only
that, the company can also provide various types of special steels
according to the characteristics of the project, such as
high-strength low-alloy steel for super high-rise buildings,
weathering steel to adapt to complex climates, and meet various
engineering needs.
In the transportation link, the company relies on a huge logistics
network and a professional transportation team to carefully plan
the transportation route, comprehensively consider the distance,
road conditions, and traffic restrictions, combined with steel
specifications and weight, and match suitable transportation tools
to ensure safety and efficiency. The whole process uses advanced
information technology to track in real time, and customers can
grasp the dynamics of steel transportation at any time. After
arriving at the site, professionals will assist in unloading,
reasonable stacking, seamless connection with construction, reduce
the risk of loss and delay, and escort the project in an all-round
way.
Company Profile:
China CT Steel Structure Co.,Ltd of BY GROUP is a comprehensive industrial group integrating for
steel structure design, manufacture and installation. We have
estabulished over 15 years. Our factory is covering about106,5 60
square meters.
Main products: steel structural warehouse, workshop, high rise steel building,
school, hotel,office building, exhibition building, show room,
shopping mall, stadium,Agricultural project (stable/cattle barn,
poultry house,pig house), car parking, hangar,shed,storage room,
prefab house, container house, Sandwich panel,corrugated steel
sheet, C&Z sec- tion steel, door and windows and cranes.
Packing: we pack all the parts on the steel pallet and push into the
container when clients received they can pulling them out within
half an hour. It can help our clients to save a lot of time and
labor cost during unloading.
Container loading:We will supply the materials list, the packing lists based on the
contents we loaded into container. Showing the quantity, part no.
length, container no, seal no.after finishing the container
loading.
Installation drawings: we will supply the detailed installation
drawings and video to show how to install the products. Even send
the engineers to site for installation help.
"Quality and service first "is our company's development goals. We
hope we will develop together and win more projects together!
Packaging & Shipping:
1. All standard components are packed in plywood box.
2. All steel structure weld components are packed with blanket or
bubble-wrap to avoid scratch during loading and unloading.
3. All steel structure are packed in steel pallet together into
container, much save loading and unloading time, labor cost.
4. All sandwich panel are packed in steel pallet.
5. Material components will be made container load plan, also make
regional unloading plan to avoid retransport on site.
6. All equipment pasted with English lable
7. Small equipment will packed in carton or plywood box
Certificate:
FAQ:
![]() |