Categories | Hydraulic Tower Self-Climbing Concrete Placing Boom |
---|---|
Brand Name: | Saintyol DAWIN |
Model Number: | HGY29 32 33 |
Certification: | SafeWork SGS CE ISO |
Place of Origin: | China |
MOQ: | 1 set |
Price: | USD40000 ---USD45000 /set |
Payment Terms: | LC TT, L/C, T/T |
Supply Ability: | 100 sets/ month |
Delivery Time: | 30 working days |
Packaging Details: | Standard exporting package |
Key Word: | Concrete Placing Boom |
Material: | Steel Q345 HG70 |
Control: | Cordless remote control |
Lift power: | hyraulic |
Fittings: | Rexroth |
Placing radius: | 29m 32m 33m |
Placing Boom arms: | 3 stages 4stages |
Model | Units | HGY29C | ||
Performance | Max.radius of placing boom | m | 28.9 | |
Freestanding height (to the joint between the end of the boom and
swivel table) () | m | 22.7 | ||
Boom articulation | ° | 400 | ||
Slewing brake | / | always close | ||
Working temperature | ºC | 0ºC~60ºC | ||
Total weight | kg | 19100 | ||
Counter weight | kg | Have no | ||
Power | / | 380V/50HZ | ||
Motor | Model | / | Y2-160M-4 | |
Power | kW | 11 | ||
Hydraulic system | Pressure | MPa | 30 | |
Flux | l/min | 18 | ||
Hydraulic oil | Circumstance temperature 35ºC-50ºC35ºC-50ºC | / | L-HM 68 | |
Circumstance temperature 5ºC-35ºC5ºC- 35ºC | / | L-HM 46 | ||
Circumstance temperature -15ºC-5ºC-15ºC-5ºC | / | L-HM 32 | ||
Control mode | / | Short-haul Control /radio remote control/ | ||
Pipeline cleaning | / | Wet cleaning/Dry cleaning / | ||
Structure of tower body | / | Tubular column | ||
Section of tower body | m×m | 0.75×0.75 | ||
Boom | Shape | / | Three hydraulic foldable arms R | |
Inner diameter of pipeline | mm | DN125 | ||
End hose | ″×mm | 5″×3000 | ||
1st section | Length | m | 11.5 | |
Articulation | ° | 0°~82.5° | ||
2nd section | Length | m | 9.3 | |
Articulation | ° | 0°~180° | ||
3rd section | Length | m | 8.1 | |
Articulation | ° | 0°~180° | ||
Climbing | Climbing mode | / | By hydraulic cylinder climbing | |
Interval of climbing | m | 0.52 | ||
Floor frame | / | Hole prepared in floor | ||
Shaft frame | m | Hole prepared in floor 2.0~2.7 | ||
Min.Interval of climbing frame | Climbing | m | 3.0 | |
Placing concrete | m | 6.0 | ||
Rest | m | 6.0 |
Model | Units | HGY33E | ||
Performance | Max.radius of placing boom | m | 33 | |
Freestanding height (to the joint between the end of the boom and
swivel table) () | m | 22.7 | ||
Boom articulation | ° | 400 | ||
Slewing brake | / | always close | ||
Working temperature | ºC | 0ºC~60ºC | ||
Total weight | kg | 21200 | ||
Counter weight | kg | Have no | ||
Power | / | 380V/50HZ | ||
Motor | Model | / | Y2-160L-4 | |
Power | kW | 15 | ||
Hydraulic system | Pressure | MPa | 30 | |
Flux | l/min | 18 | ||
Hydraulic oil | Circumstance temperature 35ºC-50ºC35ºC-50ºC | / | L-HM 68 | |
Circumstance temperature 5ºC-35ºC5ºC- 35ºC | / | L-HM 46 | ||
Circumstance temperature -15ºC-5ºC-15ºC-5ºC | / | L-HM 32 | ||
Control mode | / | Short-haul Control /radio remote control/ | ||
Pipeline cleaning | / | Wet cleaning/Dry cleaning / | ||
Structure of tower body | / | Tubular column | ||
Section of tower body | m×m | 0.75×0.75 | ||
Boom | Shape | / | Three hydraulic foldable arms R | |
Inner diameter of pipeline | mm | DN125 | ||
End hose | ″×mm | 5″×3000 | ||
1st section | Length | m | 12.38 | |
Articulation | ° | 0°~82.5° | ||
2nd section | Length | m | 10.93 | |
Articulation | ° | 0°~180° | ||
3rd section | Length | m | 9.69 | |
Articulation | ° | 0°~180° | ||
Climbing | Climbing mode | / | By hydraulic cylinder climbing | |
Interval of climbing | m | 0.52 | ||
Floor frame | / | Hole prepared in floor | ||
Shaft frame | m | Hole prepared in floor 2.0~2.7 | ||
Min.Interval of climbing frame | Climbing | m | 3.0 | |
Placing concrete | m | 6.0 | ||
Rest | m | 6.0 |
DAWIN Machinery is a company specializing in the research, design
and production of construction machinery for nearly 20 years. We
provide the most reasonable solution according to the special
demand from different customers. Our main products for construction
machinery are as follows: Concrete mixer, concrete batching plant,
diesel concrete mixer, concrete pump, sand so on. With several
researching and producing bases in China, we can provide the
powerful technical service and upper quality machinery for the
clients all over the world.
We take care of your order!
1. Best manufacturer in North China.
2. A factory with over 20 years' experience.
3. Professional teamwork of every process.
4. Competitive price and perfect quality.
5. Efficient after-sale service.
DAWIN Machinery Answers:
1. Why should I choose your Trailer Concrete Pump? / Placing Boom/Placer
We are a professional manufacturer of Trailer Concrete Pump for 13
years, In our country, we attended many national projects and the
customers are satisfied with our quality. All these can meet your
requirements. So I think our product is your best choice.
2. Do you have CE certification and do you have ISO9001: 2008
certification?
Yes, all our Trailer Concrete Pump are CE certified and our
production process has passed the ISO9001: 2008 standards.
3. Which country have you exported to?
DAWIN Trailer Concrete Pump have exported our products to Algeria,
Indonesia, Russia, Kazakhstan, Kyrgyzstan and Turkey etc.
4. What about the Truck Concrete Boom Pump/ Placing Boom/Placer delivery time?
Generally, the manufacturing time is about 15-30 days. The
transport time is different according to your region.
5. What about the after-sale service and product warranty.
We will dispatch our engineers to your country to help you with the
installation of Trailer Concrete Pump and training your workers.
The warranty time is 12 month after it built.
6. What about the price of Truck Concrete Boom Pump/ Placing Boom/Placer?
We promise to give you the most favorable price to establish a
long-term win-win cooperation with you.
7. What payment method can you accept?
Generally, T/T or 100% LC at sight is the best for us.
8. Can we be your agent in our country?
Yes, no problems for our Trailer Concrete Pump.
After-sale Service
1. May enjoy the life-long service after you buy our products.
2. Training the operator for free.
3. Under the condition that foundation, water source, power source,
aggregate, hosting
Equipment, auxiliary staff is ready. Engineers are available if you
need.
4. Certain quantity stochastic tool will be provided while
delivering goods.
5. Within 48 hours service will be available according to different
regions after received
The telephone.
6. For exported products, Our company sends the constructor to help
to operate and
Management equipment, time according to your needs. The related fee
will be undertaken
By buyers.
7. Promptly provides the fittings according to users' demands,
handles for the user consigns
For shipment.
8. All products (easy worn parts not included) loss caused by
non-human factors will be
Free of charge for half a year.
9. Provides the technology advisory service as necessary.
10. Please contact me via telephone when you have any problems with
the plant.
Dear Friends:
Welcome to our website and hope our trailer concrete pump/Placing
Boom / Concerete Placer will make you satisfied. We think
creatively, design bravely, manufacture precisely and loyalty to
our customers. And we have our own factory. So We can produce the
products, according to customer requirements.
Enjoy DAWIN Machinery Enjoy Better Life!
Yours sincerely
Dawin Machinery